| Standard Hours | Manufacturer Warranty Hours | Skill Level | Notes |
| Replace |
| Right Bank | 13.1 | 10.1 | A | Includes: R&R Cylinder Head, Oil Pan & Plastigage Bearings. |
| Left Bank | 12.2 | 9.2 | A | Includes: R&R Cylinder Head, Oil Pan & Plastigage Bearings. |
| Both Banks | 17.1 | 13.1 | A | Includes: R&R Cylinder Head, Oil Pan & Plastigage Bearings. |
| Add Following Operations If Performed With Piston & Ring Jobs |
| Main Bearings, Renew | 1.7 | 0.0 | A | Add The Following Operations If Performed Along With Piston & Ring Jobs. |
| Crankshaft, Renew | 4.2 | 0.0 | A | Does Not Include: R&R Engine |
| Oil Pump, Renew | 1.2 | 0.0 | A | Does Not Include: R&R Engine |
| Oil Pump Screen, Clean | 0.2 | 0.0 | A | Does Not Include: R&R Engine |
| Rear Main Oil Seal, Renew | 4.0 | 0.0 | A | Does Not Include: R&R Engine |
| Timing Chain & Gears, Renew | 2.3 | 0.0 | A | Does Not Include: R&R Engine |
| Valves, Grind |
| See Valves Grind Head Removed And Combinations. |