| Standard Hours | Manufacturer Warranty Hours | Skill Level | Notes |
| Replace |
| Add Following Operations If Performed With Piston & Ring Jobs |
| Main Bearings | 1.0 | 0.0 | A | Add The Following Operations If Performed With Piston & Ring Jobs. |
| Crankshaft, Renew | 3.0 | 0.0 | A | Add The Following Operations If Performed With Piston & Ring Jobs. |
| Oil Pump, Renew | 0.2 | 0.0 | A | Add The Following Operations If Performed With Piston & Ring Jobs. |
| Oil Pump Screen, Clean | 0.2 | 0.0 | A | Add The Following Operations If Performed With Piston & Ring Jobs. |
| Rear Main Oil Seal, Renew | 0.5 | 0.0 | A | Add The Following Operations If Performed With Piston & Ring Jobs. |
| Timing Chain, Renew | 1.2 | 0.0 | A | Add The Following Operations If Performed With Piston & Ring Jobs. |
| Tune-Up | 0.6 | 0.0 | A | See Valves, Grind Head Removed & Combinations. |
| Valves, Grind |
| See Valves, Grind Head Removed & Combinations. |
| Right Side | 11.3 | 8.3 | A | Includes: R&R Cylinder Head, Oil Pan & Plastigage Bearings. |
| Left Side | 11.0 | 8.0 | A | Includes: R&R Cylinder Head, Oil Pan & Plastigage Bearings. |
| Both Sides | 15.8 | 11.8 | A | Includes: R&R Cylinder Head, Oil Pan & Plastigage Bearings. |