Diesel Data: Automotive Repair

Installation







INSTALLATION

1. Install rear transmission cooler lines at transmission. Tighten fittings to 20 Nm (18 ft. lbs.).
2. Install rear transmission cooler lines to thermal bypass valve. Tighten fittings to 20 Nm (18 ft. lbs.).
3. Install front transmission cooler lines to thermal bypass valve. Tighten fittings to 20 Nm (18 ft. lbs.).
4. Install front transmission cooler lines into transmission cooler Transmission Cooler Line Quick Connect Fitting Disassembly/Assembly.
5. Lower vehicle.
6. Check transmission fluid level Check Oil Level - 42RLE.