Glove Box Lamp: Description and Operation
CIRCUIT OPERATIONThe glove box lamp receives power on the M1 circuit from the 10 Amp fuse located in the Power Distribution Center (PDC). A switch, wired in series after the lamp, CLOSES when the glove box door is opened, and completes a path to ground on the Z3 circuit.
The Z3 circuit is spliced in with the ash receiver lamp, PRNDL lamp, and the time delay relay. The Z3 circuit terminates at the instrument panel left center support.