Removal - Lines And Hoses
REMOVAL - LINES AND HOSES
COOLANT SUPPLY LINE
1. Raise vehicle on hoist.
2. Drain cooling system.
3. Remove banjo bolt from coolant supply line at turbocharger.
4. Disconnect coolant supply line flared fitting from brass fitting at engine block.
5. Remove coolant supply line.
COOLANT RETURN LINE
1. Drain cooling system.
2. Remove air cleaner housing.
3. Disconnect Inlet Air Temperature (IAT) sensor connector.
4. Disconnect Throttle Inlet Pressure (TIP) hose from charge air cooler hose.
5. Loosen hose clamp at throttle body.
6. Disconnect charge air cooler hose from throttle body. Reposition charge air cooler hose.
7. Remove fastener securing coolant return line bracket to cylinder head cover stud.
8. Remove hose clamp from coolant return line at heater tube. Disconnect hose from heater tube.
9. Remove banjo bolt from coolant return line at turbocharger.
10. Remove coolant return line.