Rocker Arm Assembly: Labor Times
Standard Hours | Manufacturer Warranty Hours | Skill Level | Notes | |
Replace | ||||
One | 0.2 | 0.0 | B | After valve Covers Are Removed. |
All | ||||
One Bank | 0.7 | 0.0 | B | After valve Covers Are Removed. |
Both Banks | 0.9 | 0.0 | B | After valve Covers Are Removed. |
Note | ||||
If Necessary to Tilt Engine for Push Rods on Cylinders 3 & 5, Add | 2.2 | 0.0 | B |