| Standard Hours | Manufacturer Warranty Hours | Skill Level | Notes |
Replace |
Manual Trans |
One | 10.9 | 0.0 | A | Includes: R&R Cylinder Heads & Oil Pan. Hone Cylinder Walls And Plastigage Bearings. |
One, Both Banks | 13.2 | 0.0 | A | Includes: R&R Cylinder Heads & Oil Pan. Hone Cylinder Walls And Plastigage Bearings. |
All | 17.6 | 0.0 | A | Includes: R&R Cylinder Heads & Oil Pan. Hone Cylinder Walls And Plastigage Bearings. |
Note |
With AC, Add | 0.5 | 0.0 | A | |
Auto Trans |
One | 11.1 | 0.0 | A | |
One, Both Banks | 13.3 | 0.0 | A | |
All | 17.8 | 0.0 | A | |
Note |
With AC, Add | 0.5 | 0.0 | A | |
Add Following Operations If Performed With Piston & Ring Jobs. |
Main Bearings, Renew |
Manual Trans |
Without AC | 3.9 | 0.0 | A | |
With AC | 4.0 | 0.0 | A | |
Auto Trans |
Without AC | 4.0 | 0.0 | A | |
With AC | 4.2 | 0.0 | A | |
Crankshaft, Renew |
Manual Trans | 4.1 | 0.0 | A | |
Auto Trans | 4.3 | 0.0 | A | |
Oil Pump, Renew | 1.2 | 0.0 | A | |
Oil Pump Screen, Clean | 0.1 | 0.0 | A | |
Timing Gears, Renew | 2.4 | 0.0 | A | |
Tune-Up | 0.6 | 0.0 | A | |