| Standard Hours | Manufacturer Warranty Hours | Skill Level | Notes |
| Diagnose/Test |
| Engine Oil Leaks | 1.0 | 0.0 | C | |
| Replace |
| Complete Assembly Without Transfer Of Parts | 5.0 | 0.0 | B | Does Not Include: Transfer Of Any Part Of Engine Or Replacement Of Optional Equipment. |
| Note |
| With AC, Add | 1.4 | 0.0 | B | |
| With PS, Add | 0.8 | 0.0 | B | |
| Complete Assembly With Transfer Of Parts | 7.5 | 0.0 | B | Includes: Transfer All Fuel And Electrical Units. Does Not Include: Transfer Of Optional Equipment. |
| Note |
| With AC, Add | 1.4 | 0.0 | B | |
| With PS, Add | 0.8 | 0.0 | B | |
| Long Block | 11.2 | 0.0 | A | Includes: R&R Engine And Transfer All Necessary Components Not Supplied With Long Block. |
| Note |
| With AC, Add | 1.4 | 0.0 | B | |
| With PS, Add | 0.8 | 0.0 | B | |
| To Grind Valves, Add | 3.0 | 0.0 | B | |
| Short Block | 15.4 | 0.0 | A | Includes: R&R Engine And Transfer All Necessary Components. |
| Note |
| With AC, Add | 1.4 | 0.0 | A | |
| With PS, Add | 0.8 | 0.0 | A | |
| To Grind Valves, Add | 3.0 | 0.0 | A | |
| Overhaul/Rebuild | 21.4 | 0.0 | A | Includes: Disassemble And Clean Engine. Ridge Ream & Hone Cylinders, Fit Pistons, Rings, Pins, Main & Rod Bearings, Grind Valves And Tune-up. |
| Note |
| With AC, Add | 1.4 | 0.0 | A | |
| With PS, Add | 0.8 | 0.0 | A | |