Oil Pump: Service and Repair
Oil Pump
Removal
NOTICE: During engine repair procedures, cleanliness is extremely important. Any foreign material, including any material created while cleaning gasket surfaces, that enters the oil passages, coolant passages or the oil pan may cause engine failure.
1. Remove the engine front cover. For additional information, refer to Engine Front Cover Service and Repair.
2. Rotate the crankshaft clockwise and align the timing marks on the intake Variable Camshaft Timing (VCT) assemblies as shown.
3. Remove the 3 bolts and the LH valve train oil tube.
4. NOTE: The Camshaft Holding Tool will hold the camshafts in the Top Dead Center (TDC) position.
Install the Camshaft Holding Tool onto the flats of the LH camshafts.
5. Remove the 3 bolts and the RH valve train oil tube.
6. NOTE: The Camshaft Holding Tool will hold the camshafts in the TDC (Top Dead Center) position.
Install the Camshaft Holding Tool onto the flats of the RH camshafts.
NOTE: The following 3 steps are for primary timing chains that the colored links are not visible.
7. Mark the timing chain link that aligns with the timing mark on the LH intake VCT (Variable Camshaft Timing) assembly as shown.
8. Mark the timing chain link that aligns with the timing mark on the RH intake VCT (Variable Camshaft Timing) assembly as shown.
9. NOTE: The crankshaft sprocket timing mark should be between the 2 colored links.
Mark the 2 timing chain links that align with the timing mark on the crankshaft sprocket as shown.
10. Remove the 2 bolts and the primary timing chain tensioner.
11. Remove the primary timing chain tensioner arm.
12. Remove the 2 bolts and the lower LH primary timing chain guide.
13. Position the primary timing chain aside and remove the crankshaft timing chain sprocket.
14. Remove the 2 bolts and the oil pump screen and pickup tube.
- Discard the O-ring seal.
15. Remove the 3 bolts and the oil pump.
Installation
1. Install the oil pump and the 3 bolts.
- Tighten to 10 Nm (89 lb-in).
2. Using a new O-ring seal, install the oil pump screen and pickup tube and the 2 bolts.
- Tighten to 10 Nm (89 lb-in).
3. Install the crankshaft timing chain sprocket with timing dot mark out.
4. NOTE: It may be necessary to rotate the camshafts slightly, to align the timing marks.
Position the primary timing chain with the colored links aligned with the timing marks on the VCT (Variable Camshaft Timing) assemblies and the crankshaft sprocket.
5. Install the lower LH primary timing chain guide and the 2 bolts.
- Tighten to 10 Nm (89 lb-in).
6. Install the primary timing chain tensioner arm.
7. Reset the primary timing chain tensioner.
- Release the ratchet detent.
- Using a soft-jawed vise, compress the ratchet plunger.
- Align the hole in the ratchet plunger with the hole in the tensioner housing.
- Install a suitable lockpin.
8. NOTE: It may be necessary to rotate the camshafts slightly to remove slack from the timing chain to install the tensioner.
Install the primary tensioner and the 2 bolts.
- Tighten to 10 Nm (89 lb-in).
- Remove the lockpin.
9. As a post-check, verify correct alignment of all timing marks.
- There is 48 links in between the RH intake VCT (Variable Camshaft Timing) assembly colored link (1) and the LH intake VCT (Variable Camshaft Timing) assembly colored link (2).
- There is 35 links in between LH intake VCT (Variable Camshaft Timing) assembly colored link (2) and the 2 crankshaft sprocket links (3).
10. Remove the RH Camshaft Holding Tool.
11. Install the RH valve train oil tube and the 3 bolts and tighten in 2 stages.
- Stage 1: Tighten to 8 Nm (71 lb-in).
- Stage 2: Tighten an additional 45 degrees.
12. Remove the LH Camshaft Holding Tool.
13. Install the LH valve train oil tube and the 3 bolts and tighten in 2 stages.
- Stage 1: Tighten to 8 Nm (71 lb-in).
- Stage 2: Tighten an additional 45 degrees.
14. Install the engine front cover. For additional information, refer to Engine Front Cover Service and Repair.