Test E: The Demand Lamps Are Inoperative
PINPOINT TEST E: THE DEMAND LAMPS ARE INOPERATIVENormal Operation
The smart junction box (SJB) provides voltage to the demand lamps through circuit 53 (BK/LB). Ground for the demand lamps is provided through circuit 1205 (BK).
This pinpoint test is intended to diagnose the following:
- Wiring, terminals or connectors
- Interior lamp