Diesel Data: Automotive Repair

Piston: Labor Times

Standard HoursManufacturer Warranty HoursSkill LevelNotes
Replace
Note
With AC, Add0.40.2AIncludes: R&R Cylinder Head, Oil Pan & Plastigage Bearings.
Add Following Operations If Performed With Piston & Ring Jobs
Crankshaft, Renew3.30.0AAdd Any Of The Following Operations If Performed Along With Piston & Ring Jobs.
Oil Pump, Renew1.20.0AAdd Any Of The Following Operations If Performed Along With Piston & Ring Jobs.
Timing Belt, Renew0.50.0AAdd Any Of The Following Operations If Performed Along With Piston & Ring Jobs.
Tune-Up0.40.0AAdd Any Of The Following Operations If Performed Along With Piston & Ring Jobs.
Main Bearings. Renew1.20.0AAdd Any Of The Following Operations If Performed Along With Piston & Ring Jobs.
Valves, Grind
    See Valves Grind Head Removed And Combinations.
One CYL5.53.9AIncludes: R&R Cylinder Head, Oil Pan & Plastigage Bearings.
All Cyls7.35.2AIncludes: R&R Cylinder Head, Oil Pan & Plastigage Bearings.
Each Additional1.00.7AIncludes: R&R Cylinder Head, Oil Pan & Plastigage Bearings.