Crankshaft Installation
Crankshaft Installation
Special Tools Required
- Driver Handle, 15 x 135L 07749-0010000
- Bearing Driver Attachment, 24 x 26 mm 07746-0010700
- Oil Seal Driver Attachment, 96 mm 07ZAD-PNAA100
1. Check the main bearing clearance with plastigage Service and Repair.
2. Check the connecting rod bearing clearance with plastigage Service and Repair.
3. Install the bearing halves in the engine block and the connecting rods.
4. Apply a coat of new engine oil to the main bearings and the rod bearings.
5. Install the CKP pulse plate to the crankshaft CKP Pulse Plate Replacement.
6. Hold the crankshaft so rod journal No. 2 and rod journal No. 3 are straight up, and lower the crankshaft into the engine block. Be careful not to damage the journals and the CKP pulse plate.
7. Apply new engine oil to the thrust washer surfaces. Install the thrust washers (A) in the No. 4 journal of the engine block.
8. Inspect the connecting rod bolts.
9. Apply new engine oil to the threads of the connecting rod bolts.
10. Seat the rod journals into connecting rod No. 1 and connecting rod No. 4. Line up the mark (B) on the connecting rod and the cap, then install the caps and bolts finger-tight.
11. Rotate the crankshaft clockwise, and seat the journals into connecting rod No. 2 and connecting rod No. 3. Line up the mark on the connecting rod and the cap, then install the caps and bolts finger-tight.
12. Tighten the connecting rod bolts to 41 Nm (4.2 kg-m, 30 lb-ft).
13. Tighten the connecting rod bolts an additional 120 °.
NOTE: Remove the connecting rod bolt if you tightened it beyond the specified angle, and go back to step 8 Crankshaft Installation of the procedure. Do not loosen it back to the specified angle.
14. Remove all of the old liquid gasket from the lower block mating surfaces, the bolts, and the bolt holes.
15. Clean and dry the lower block mating surfaces.
16. Apply liquid gasket (P/N 08717-0004, 08718-0003, 08718-0004, or 08718-0009) evenly to the engine block mating surface of the lower block, and to the inside edge of the threaded bolt holes. Install the component within 5 minutes of applying the liquid gasket.
NOTE:
- Apply a 2.5 mm (0.098 in) diameter bead of liquid gasket along the broken line (A).
- If too much time has passed after applying the liquid gasket, remove the old liquid gasket and residue, then reapply new liquid gasket.
17. Put the lower block on the engine block.
18. Apply new engine oil to the threads of the bearing cap bolts. Tighten the bearing cap bolts in sequence, to 29 Nm (3.0 kg-m, 22 lb-ft).
19. Tighten the bearing cap bolts an additional 48 °.
20. Tighten the 8 mm bolts in sequence to 22 Nm (2.2 kg-m, 16 lb-ft).
NOTE:
- Wait at least 30 minutes before filling the engine with oil.
- Do not run the engine for at least 3 hours after installing the oil pan.
21. Apply a light coat of new engine oil to the lip of the crankshaft oil seal.
22. Use the driver handle, 15 x 135L and the oil seal driver attachment, 96 mm to drive a new oil seal (A) squarely into the block to the specified installed height.
23. Clean the excess oil off the crankshaft, and check the oil seal lip is not distorted.
24. Measure the distance between the engine block (A) and the crankshaft oil seal (B).
25. Install the baffle plate.
26. Install the oil pump Overhaul.
27. Install the oil pan Engine Oil Pan Installation.
28. Install the cylinder head.
29. Install the CKP sensor CKP Sensor Replacement.
30. Install the drive plate Service and Repair.
31. Install the transmission Automatic Transmission Installation.
32. Install the engine/transmission Engine Installation.
NOTE: Whenever any crankshaft or connecting rod bearing is replaced, run the engine at idle speed until it reaches normal operating temperature, then continue to run it for about 15 minutes.