Crankshaft Installation
Crankshaft Installation
Special Tools Required
- Bearing Driver Attachment, 28 x 30 mm 07946-1870100
- Driver Handle, 15 x 135L 07749-0010000
- Oil Seal Driver Attachment, 96 mm 07ZAD-PNAA100
1. M/T model: Install the pilot bearing when replacing the crankshaft.
2. A/T model: Install the crankshaft end bushing when replacing the crankshaft. Using the driver handle, 15 x 135L (A) and the bearing driver attachment, 28 x 30 mm (B), to drive the crankshaft end bushing squarely into the crankshaft to the specified installed height.
3. A/T model: Measure the distance between the crankshaft (A) surface and crankshaft end bushing (B).
4. Check the main bearing clearance with a plastigage Service and Repair.
5. Check the connecting rod bearing clearance with a plastigage Service and Repair.
6. Install the bearing halves in the engine block and the connecting rods.
7. Apply new engine oil to the inside of the main bearings and the connecting rod bearings.
8. Install the CKP pulse plate (A) on the crankshaft (B); face the marked side (C) toward the transmission, and align the tab (D) on the CKP pulse plate with the groove (E) on the crankshaft.
9. Hold the crankshaft so that connecting rod journal No. 2 and connecting rod journal No. 3 are straight up, and lower the crankshaft into the engine block.
10. Apply new engine oil to the side with the thrust washer groove. Install the thrust washers (A) in the No. 4 journal.
11. Inspect the connecting rod bolts Connecting Rod Bolt Inspection.
12. Apply new engine oil to the threads and flanges of the connecting rod bolts.
13. Seat the connecting rod journals into connecting rod No. 1 and connecting rod No. 4. Line up the mark (A) on the connecting rod and the connecting rod cap, then install the connecting rod caps and the connecting rod bolts finger-tight.
14. Rotate the crankshaft clockwise, and seat the connecting rod journals into connecting rod No. 2 and connecting rod No. 3. Line up the mark on the connecting rod and the connecting rod cap, then install the connecting rod caps and the connecting rod bolts finger-tight.
15. Torque the connecting rod bolts to 9.8 Nm (1.0 kg-m, 7 lb-ft).
16. Tighten the connecting rod bolts an additional 90 °.
NOTE: Remove the connecting rod bolt if you tightened it beyond the specified angle, and go back to step 11 of the procedure. Do not loosen it back to the specified angle.
17. Install the main bearing caps with facing the arrows (A) the cam chain side on the bearing cap bridge.
18. Remove all of the old liquid gasket from the bearing cap bridge/No. 5 main bearing cap mating surfaces.
19. Clean and dry the bearing cap bridge/No. 5 main bearing cap mating surfaces.
20. Apply liquid gasket (P/N 08717-0004, 08718-0003, 08718-0004, or 08718-0009) to the engine block mating surface of the bearing cap bridge/No. 5 main bearing cap. Install the component within 5 minutes of applying the liquid gasket.
NOTE:
- Apply a 2.5 mm (0.098 in) diameter bead of liquid gasket along the broken line (A).
- If you apply liquid gasket P/N 08718-0012, the component must be installed within 4 minutes.
- If too much time has passed after applying the liquid gasket, remove the old liquid gasket and residue, then reapply new liquid gasket.
21. Put the bearing cap bridge on the engine block.
22. Apply new engine oil to the threads and the flange of the bearing cap bolts.
23. Torque the bearing cap bolts in sequence to 25 Nm (2.5 kg-m, 18 lb-ft).
24. Tighten the bearing cap bolts an additional 40 °.
25. Clean the excess liquid gasket off the engine block.
26. Clean and dry the crankshaft oil seal housing.
27. Apply a light coat of new engine oil to the lip of the crankshaft oil seal.
28. Using the driver handle (A) and the oil seal driver attachment, 96 mm (B), to drive a new crankshaft oil seal squarely into the block to the specified installed height.
29. Measure the distance between the cylinder block (A) and the crankshaft oil seal (B).
30. Install the oil pump (A) with a new O-ring (B).
31. Install the oil screen (C) with a new gasket (D).
32. Install the oil pan Engine Oil Pan Installation.
33. Install the cylinder head Cylinder Head Installation.
34. Connect the CKP sensor connector (A), then install the CKP sensor cover (B).
35. Install the harness cover (C).
36. M/T model: Install the flywheel, the clutch disc, and the pressure plate.
37. A/T model: Install the drive plate Service and Repair.
38. Install the transmission.
- M/T model Manual Transmission Installation
- A/T model Automatic Transmission Installation
39. Install the engine/transmission Engine Installation.
NOTE: When any crankshaft main or connecting rod bearing is replaced, run the engine at idle until it reaches normal operating temperature, then continue to run it for about 15 minutes.