Recirculation Actuator Replacement
The content of this article reflects the changes identified in TSB:
Bulletin No. 06-01-39-003
Date: March 31, 2006
Recirculation Actuator Replacement
Removal Procedure
1. Remove the instrument panel (I/P) upper trim pad. Refer to Trim Pad Replacement - Instrument Panel (I/P) Upper.
2. Disconnect the electrical connector from the recirculation actuator.
3. Remove the screws from the recirculation actuator (1).
4. Remove the recirculation actuator (1) from the HVAC module assembly (2).
Installation Procedure
1. Install the recirculation actuator (1) to the HVAC module assembly (2).
Note:
Refer to Fastener Notice in Cautions and Notices.
2. Install the screws to the recirculation actuator (1).
Tighten
Tighten the screws to 2 N.m (18 lb. in.).
3. Connect the electrical connector to the recirculation actuator.
4. Install the I/P upper trim pad. Refer to Trim Pad Replacement - Instrument Panel (I/P) Upper.
5. Reprogram the recirculation actuator. Refer to Re-Calibrating Actuators.