Diesel Data: Automotive Repair

Rear Glass Defogger Switch





Inspection

1. The rear glass defogger switch inputs can be checked using the GDS.
2. To check the input value of rear glass defogger switch, select option "IPM".
3. To consult the present input/output value of IPM, "Current DATA". It provides information of IPM input/output conditions of rear defogger relay.




4. To check the input value of rear glass defogger switch in force mode, select option "Actuation Test".






Removal

1. Disconnect the negative (-) battery terminal.
2. Remove the center fascia panel.





3. Remove the heater control unit (A) after removing screws.






Installation

1. Install the heater control unit.
2. Install the center fascia panel.