Installation
PROCEDURE1. Install Injectors and Delivery Pipe.
- Install the grommet to each Injector.
- Apply a light coat of gasoline to a new O-ring and install it to each Injector.
O-ring Installation:
- While turning the Injector clockwise and counterclockwise, push it to the Delivery Pipe. Install the 6 Injectors.
- Position the Injector connector outward.
O-ring Installation:
- Place the 6 insulators and 3 spacers in position on the intake manifold.
O-ring Installation:
- Place the 6 Injectors together with the Delivery Pipe in position on the intake manifold.
- Temporarily install the 3 bolts holding the Delivery Pipe to the intake manifold.
- Check that the Injectors rotate smoothly.
NOTE: If Injectors do not rotate smoothly, the probable cause is incorrect installation of O-rings. Replace the 0 - rings.
- Position the Injector connector upward.
- Tighten the 3 bolts holding the Delivery Pipe to the intake manifold.
Torque: 21 Nm (15 ft lb)
2. Install actuator for ACIS with the 2 bolts.
Torque: 6.8 Nm (61 in lb)
3. Connect Injector connectors.
NOTE: The No. 1, No. 3 and No. 5 Injector connectors are dark gray, and the No. 2, No. 4 and No. 6 Injector connectors are gray.
4. Connect vacuum sensing hose.
5. Install the No. 1 and No. 2 air intake chamber stays.
NOTE: The No. 1 stay is marked with F and No. 2 stay is marked with "R".
Torque: 18 Nm (13 ft lb)
6. Connect fuel return pipe with 2 new gaskets and the union bolt to the Fuel Pressure Regulator.
Torque: 27 Nm (20 ft lb)
7. Connect fuel inlet pipe with 2 new gaskets and the union bolt to the Delivery Pipe.
Torque: 42 Nm (30 ft lb)
8. Install no. 2 vacuum pipe with the 2 nuts.
Torque: 21 Nm (15 ft lb)
9. Connect EGR Gas Temperature Sensor connector to the wiring connector.
- Install the connector to the No. 2 vacuum pipe.
10. Install Throttle Body with intake air connector
11. Check for fuel leaks.