Diesel Data: Automotive Repair

Installation








1UR-FSE EMISSION CONTROL: CANISTER: INSTALLATION

INSTALLATION

1. INSTALL CHARCOAL CANISTER ASSEMBLY





(a) Install the charcoal canister assembly, 2 spacers and 4 nuts.
Torque: 14.7 Nm (150 kgf-cm, 11 ft-lbf)





(b) Connect the 2 quick connectors, hose and connector.





(c) Connect the connector with the 2 clamps.





2. INSTALL FLOOR UNDER COVER
(a) Install the floor under cover with the 3 nuts and 6 clips.
3. CONNECT CABLE TO NEGATIVE BATTERY TERMINAL
NOTE:
When disconnecting the cable, some systems need to be initialized after the cable is reconnected Repair Instruction - Initialization