Diesel Data: Automotive Repair

Installation





2GR-FE EMISSION CONTROL: PURGE VALVE: INSTALLATION

1. INSTALL NO. 1 VACUUM SWITCHING VALVE

(a) Install the No. 1 vacuum switching valve with the bolt.





Torque : 10 Nm (102 kgf-cm, 7 ft-lbf)

(b) Disconnect the 2 vacuum hoses and No. 1 vacuum switching valve connector.





2. INSTALL V-BANK COVER SUB-ASSEMBLY Installation