Diesel Data: Automotive Repair

Installation





4GR-FSE EMISSION CONTROL: PCV VALVE: INSTALLATION

1. INSTALL VENTILATION VALVE SUB-ASSEMBLY

(a) Apply adhesive to 2 or 3 threads of the ventilation valve sub-assembly.





Text in Illustration





Adhesive:

Toyota genuine adhesive 1324, three bond 1324 or equivalent

(b) Install the ventilation valve sub-assembly.

Torque : 27 Nm (275 kgf-cm, 20 ft-lbf)

(c) Connect the ventilation hose.





2. INSTALL V-BANK COVER SUB-ASSEMBLY Installation