Installation
2GR-FSE EMISSION CONTROL: PURGE VALVE: INSTALLATION
1. INSTALL NO. 1 VACUUM SWITCHING VALVE ASSEMBLY
(a) Install the No. 1 vacuum switching valve assembly with the bolt.
Torque : 18 Nm (182 kgf-cm, 13 ft-lbf)
(b) Connect the 2 fuel vapor feed hoses and connector.
2. INSTALL V-BANK COVER SUB-ASSEMBLY Installation