Installation
4GR-FSE EMISSION CONTROL: CANISTER: INSTALLATION
1. INSTALL CHARCOAL CANISTER ASSEMBLY
(a) Install the charcoal canister assembly, 2 clips and 4 nuts.
Torque : 5.4 Nm (55 kgf-cm, 48 in-lbf)
(b) Connect the 2 quick connectors, hose and connector.
(c) Connect the wire harness with the 2 clamps.
2. INSTALL REAR NO. 1 FLOOR BOARD SUB-ASSEMBLY
(a) Install the rear No. 1 floor board sub-assembly with the 6 clips and 3 grommets.
3. CONNECT CABLE TO NEGATIVE BATTERY TERMINAL