| Standard Hours | Manufacturer Warranty Hours | Skill Level | Notes |
Replace | 11.5 | 8.2 | A | Includes: R&R Cylinder Head, Oil Pan & Plastigauge Bearings. |
Add Following Operations If Performed With Pstn & Ring Jobs |
Main Bearings, Renew |
Manual Trans | 6.2 | 0.0 | A | Add Any Of The Following Operations If Performed Along With Piston & Ring Jobs. |
Auto Trans | 6.4 | 0.0 | A | Add Any Of The Following Operations If Performed Along With Piston & Ring Jobs. |
Crankshaft, Renew |
Manual Trans | 6.2 | 0.0 | A | Add Any Of The Following Operations If Performed Along With Piston & Ring Jobs. |
Auto Trans | 6.4 | 0.0 | A | Add Any Of The Following Operations If Performed Along With Piston & Ring Jobs. |
Oil Pump, Renew | 0.8 | 0.0 | A | Add Any Of The Following Operations If Performed Along With Piston & Ring Jobs. |
Timing Chain, Renew | 2.8 | 0.0 | A | Add Any Of The Following Operations If Performed Along With Piston & Ring Jobs. |
Tune-Up | 0.5 | 0.0 | A | Add Any Of The Following Operations If Performed Along With Piston & Ring Jobs. |