| Standard Hours | Manufacturer Warranty Hours | Skill Level | Notes |
Replace |
One Cylinder | 6.8 | 5.3 | A | Includes: R&R Head And Oil Pan, Hone Cylinder Walls And Plastigage Bearings. |
Add Following Operations If Performed With Piston & Ring Jobs. |
Main Bearings, Renew | 1.2 | 0.0 | A | Add The Following Operations If Performed Along With Piston & Ring Jobs. |
Crankshaft, Renew | 2.0 | 0.0 | A | Does Not Include: R&R Engine. |
Oil Pump, Renew | 2.4 | 0.0 | A | Does Not Include: R&R Engine. |
Oil Pump Screen, Clean | 0.2 | 0.0 | A | Does Not Include: R&R Engine. |
Timing Chain, Renew | 2.3 | 0.0 | A | Does Not Include: R&R Engine. |
Valves, Grind |
See Valves, Grind Head Removed And Combinations. |
Tune-Up | 0.5 | 0.0 | A | See Valves, Grind Head Removed And Combinations. |
All Cylinders | 9.8 | 6.8 | A | Includes: R&R Head And Oil Pan, Hone Cylinder Walls And Plastigage Bearings. |