Installation
2AR-FE EMISSION CONTROL: CANISTER: INSTALLATION
1. INSTALL CANISTER
(a) Attach the claw and install the canister with the 3 bolts and a new clip.
Torque : 19 Nm (196 kgf-cm, 14 ft-lbf)
(b) Connect the vent line hose.
Text in Illustration
(1) Push the hose into the port and push the retainer to lock it.
NOTICE:
* Check for damage or foreign objects on the connected part.
* After connecting the hose, check that the vent hose and valve are securely connected by pulling on them.
(c) Connect the air inlet hose.
NOTICE:
* Check for damage or foreign objects on the connected part.
* After connecting the hose, check that the vent hose and valve are securely connected by pulling on them.
(d) Connect the purge line hose.
(e) Connect the connector.
2. INSTALL MAIN MUFFLER HEAT INSULATOR
(a) Install the main muffler heat insulator with the 4 nuts.
Torque : 5.5 Nm (56 kgf-cm, 49 in-lbf)