Installation
Front Lateral LinkINSTALLATION
CAUTION:
^ Be sure to use a new self-locking nut.
^ Always tighten the bushing in the state where the vehicle is at curb weight and the wheels are in full contact with the ground.
1) Install in the reverse order of removal.
Tightening torque:
Front lateral link to Sub frame
120 Nm (12.2 kgf-m, 88.5 ft-lb)
Front lateral link to Rear axle housing
60 Nm (6.1 kgf-m, 44.3 ft-lb)
2) Inspect the wheel alignment and adjust if necessary.