Diesel Data: Automotive Repair

Installation

Oil Charge Pipe

INSTALLATION

1) Install the oil charge pipe with a new O-ring.

NOTE:
Use a new bolt.

Tightening torque:
38 Nm (3.9 kgf-m, 28.0 ft-lb)





2) Turn the turbine speed sensor 1 back to the original orientation, and install the bolt and connect the connector.

Tightening torque:
7 Nm (0.7 kgf-m, 5.2 ft-lb)





3) Install the front exhaust pipe.
4) Install the under cover.
5) Lower the vehicle.
6) Connect the ground cable to battery.