Installation
Transmission Mounting SystemINSTALLATION
PITCHING STOPPER
1) Install the pitching stopper.
Tightening torque:
T1: 50 Nm (5.1 kgf-m, 36.9 ft-lb)
T2: 58 Nm (5.9 kgf-m, 42.8 ft-lb)
2) Install the air intake chamber and intake boot.
3) Connect the ground cable to battery.
TRANSMISSION REAR CROSSMEMBER & REAR CUSHION RUBBER
1) Install the rear cushion rubber to the transmission.
Tightening torque:
40 Nm (4.1 kgf-m, 29.5 ft-lb)
2) Install the crossmember.
Tightening torque:
T1: 35 Nm (3.6 kgf-m, 25.8 ft-lb)
T2: 75 Nm (7.6 kgf-m, 55.3 ft-lb)
3) Remove the transmission jack.
4) Install the heat shield cover.
Tightening torque:
18 Nm (1.8 kgf-m, 13.3 ft-lb)
5) Install the front exhaust pipe, rear exhaust pipe and muffler.
6) Connect the ground cable to battery.