A/C - Drone Noise At Idle
REF:HEATING & AIR CONDITIONING
NO.:
AC92-002
DATE:
AUGUST 19, 1992
MODEL:
'88 -'91 VV
2VZ-FE IDLE DRONE WITH A/C "ON"
1988 Through 1991 Camrys equipped with the 2VZ-FE engine may exhibit an A/C drone noise at idle under the following operating conditions:
- Ambient temperatures above 75~F
- Air Conditioning System "ON"
- Transmission in "D" Range
- A/C Compressor operating in 100% mode
- Idle speed 800 - 1,100 RPM.
NOTE:
Care must be taken not to confuse normal engine mechanical noise with this condition. Always confirm the condition using the procedure above.
To correct a customer complaint for the above condition, the kits have been made available to improve the drone noise.
INSTALLATION PROCEDURE:
Parts List
INSTALLATION PROCEDURE:
STEP 1:
A) Discharge the A/C system using an approved recycling station. Refer to your Camry Repair Manual for all necessary safeguards and specifications.
B) Replace the suction hose with the one provided in the kit.
Note:
If the vehicle was built prior to serial number 0028865, you need to replace the suction tube with the one provided.
STEP 2:
A) Loosen and remove the alternator adjusting bolt.
B) Loosen and remove the two bolts located at the front of the A/C compressor mounting bracket (BOLT 1).
C) Install the pulley bracket (BRACKET A) with the two new M10 x 70 mm bolts (BOLT A). Temporarily tighten these bolts.
D) Loosen and remove the upper compressor mounting bolt (BOLT 2).
E) Install the pulley bracket (Bracket B) with the new M8 x 120 mm bolt (BOLT C). Temporarily tighten this bolt.
F) Loosen and remove the alternator mounting bracket bolt (BOLT 3) shown.
G) Install the pulley bracket (BRACKET C) with the new M10 x 55 mm bolt (BOLT D). Temporarily tighten this bolt.
H) Join Bracket B to Bracket A with the two bolts supplied (BOLT E).
Torque to: (M8 x 25 mm) 14 ft.lbs. (19 N-m)
I) Attach bracket C to bracket B with the bolt supplied (BOLT F).
Torque to: (M6 x 25 mm) 14 ft.lbs. (19 N-m)
J) Torque all remaining bolts completely.
Bolt A (M10 x 70 mm).............27 ft.lbs. (37 N-m)
Bolt C (M8 x 120 mm).............18 ft.lbs. (25 N-m)
Bolt D (M10 x 55 mm).............27 ft.lbs. (37 N-m)
H) Install the new M8 x 90 mm adjusting bolt (BOLT B) and adjust belt tension to specifications:
New Belt 175 +/- 5 lbs
Old Belt 115 +/- 20 lbs
STEP 3:
A) Evacuate and recharge the A/C system to specification:
600 - 750g (1.32 - 1.65 lbs)
B) Operate A/C system and perform a leak check.