After Assembly
INSTALLATION OF ENGINE
1. (7M-GE) INSTALL CLUTCH DISC AND COVER
2. INSTALL TRANSMISSION TO ENGINE
3. (A/T)
INSTALL A/T OIL COOLER PIPES
4. INSTALL ENGINE WITH TRANSMISSION IN VEHICLE
(a) Attach the engine hoist chain to the engine hangers.
(b) Lower the engine into the engine compartment.
(c) Align the engine with the transmission and engine mounting supports.
(d) Install the engine mounting washers and nuts on each side of the engine.
(e) Remove the hoist chain.
5. RAISE VEHICLE
6. INSTALL ENGINE REAR SUPPORT MEMBER WITH GROUND STRAP TO BODY
7. INSTALL FRONT CROSSMEMBER
8. M/T)
INSTALL CLUTCH RELEASE CYLINDER
9. (A/T)
INSTALL MANUAL SHIFT LINKAGE
10. CONNECT SPEEDOMETER CABLE
11. INSTALL PROPELLER SHAFT
12. INSTALL EXHAUST PIPE
13. CONNECT FUEL HOSES
14. (7M-GTE)
INSTALL ENGINE MOUNTING ABSORBER
16. (M/T)
INSTALL SHIFT LEVER
17. CONNECT ENGINE OIL COOLER HOSES
18. INSTALL PS PUMP
19. (7M-GTE)
INSTALL NO.6 AIR CLEANER HOSE
20. INSTALL A/C COMPRESSOR
21. CONNECT HEATER HOSES
22. CONNECT FOLLOWING CONNECTORS AND WIRES:
(a) ECU and ECT connectors
(b) Ground strap to engine rear side
(c) Heater valve connector
(d) (7M-GE)
Oxygen sensor connector
(e) Alternator connector and wire
(f) Main relay connector
(g) (7M-GE)
Ignition coil connector
(7M-GTE)
Igniter connector
(h) (7M-GTE)
Solenoid resistor connector
(i) Check connector
(j) Theft deterrent horn connector
(k) Noise filter connector
(I) Battery positive cable to battery
(m) Ground strap to LH front fender apron
23. CONNECT FOLLOWING HOSES:
(a) Charcoal canister hose
(b) Cruise control hose
(c) Heater valve hose
(d) Brake booster hose
24. INSTALL PS BELT
25. INSTALL ALTERNATOR DRIVE BELT, WATER PUMP PULLEY AND FLUID COUPLING
26. INSTALL A/C BELT
27. INSTALL RADIATOR
28. (7M-TE)
INSTALL NO.7 AIR CLEANER HOSE WITH AIR FLOW METER AND AIR CLEANER CAP
(a) Connect the PS air hose.
(b) Connect the air flow meter connector.
(c) Connect the three air hoses and PCV hose.
29. (7M-GE)
INSTALL AIR CLEANER CASE WITH HOSES
(a) Install the air cleaner case with hoses with the three bolts.
(b) Connect the PS air hose.
(c) Connect the air flow meter connector.
30. (7M-GTE)
INSTALL NO.4 AIR CLEANER PIPE WITH NO.1 AND NO.2 AIR CLEANER HOSES
31. FILL WITH ENGINE OIL
32. FILL WITH COOLANT
34. CONNECT CABLE TO NEGATIVE TERMINAL OF BATTERY
35. START ENGINE
Warm up the engine and inspect for leaks.
36. INSTALL ENGINE UNDER COVER
37. PERFORM ENGINE ADJUSTMENT
Recheck the ignition timing.
38. ROAD TEST
Road test the vehicle.
39. RECHECK COOLANT AND ENGINE OIL LEVELS