C1313
DTC C1313 OPEN CIRCUIT IN MAIN RELAY 2CIRCUIT DESCRIPTION
ABS main relay 1 (ABS No.1 relay) supplies power to the changeover solenoid and the linear solenoid.
ABS main relay 2 (ABS No.2 relay) goes on for approximately 5 seconds after the power switch is turned off and the braking effort signal input is terminated. ABS main relay 2 (ABS No.2 relay) supplies electricity and maintains operating condition for the brake system when the power switch is off.
Wiring Diagram:
Wiring Diagram:
Wiring Diagram:
Step 1 - 2:
Step 3 - 4:
Step 5 - 6:
Step 7:
INSPECTION PROCEDURE
NOTE: When replacing the skid control ECU assy, perform initialization of linear solenoid valve and calibration.