Part 4
With A/T:
With M/T:
With A/T:
With M/T:
Except PZEV:
PARTIAL ENGINE ASSY
REPLACEMENT
121. INSTALL FRONT STABILIZER LINK ASSY LH
a) Using a 5 mm socket hexagon wrench, fix the stud bolt and install the nut.
Torque: 74 Nm (755 kgf-cm, 55 ft. lbs.)
122. INSTALL FRONT STABILIZER LINK ASSY RH
HINT: Use the same procedures described for the LH side.
123. INSTALL EXHAUST PIPE ASSY FRONT
124. CONNECT FUEL TUBE SUB-ASSY
125. INSTALL RETURN TUBE SUB-ASSY
126. INSTALL OIL RESERVOIR TO PUMP HOSE NO.1
127. INSTALL COMPRESSOR AND MAGNETIC CLUTCH
128. INSTALL GENERATOR ASSY
129. INSTALL FAN AND GENERATOR V BELT
130. CONNECT ENGINE WIRE NO.2
131. CON N ECT ENGINE WIRE
132. INSTALL ENGINE MOUNTING BRACKET NO.2 RH
Torque: 52 Nm (531 kgf-cm, 38 ft. lbs.)
133. INSTALL ENGINE MOUNTING STAY NO.2 RH
Torque: 64 Nm (653 kgf-cm, 47 ft. lbs.)
134. INSTALL ENGINE MOVING CONTROL ROD W/BRACKET
a) Install the engine mounting control rod with the 3 bolts.
Torque: 64 Nm (653 kgf-cm, 47 ft. lbs.)
135. INSTALL AIR CLEANER ASSY
Torque: 5.0 Nm (51 kgf-cm, 44 inch lbs.)
136. ADD AUTOMATIC TRANSAXLE FLUID (A/T)
137. MANUAL TRANSAXLE OIL (M/T)
138. ADD ENGINE OIL
139. ADD ENGINE COOLANT
140. ADD POWER STEERING FLUID
141. BLEED POWER STEERING FLUID
142. CHECK FOR ENGINE OIL LEAKS
143. CHECK FOR ENGINE COOLANT LEAKS
144. INSPECT FOR FUEL LEAKS
145. INSTALL FRONT WHEEL
146. ADJUST FRONT WHEEL ALIGNMENT
147. INSPECT CHECK IDLE SPEED AND IGNITION TIMING
148. INSPECT CO/HC
149. CHECK ABS SPEED SENSOR SIGNAL (W/ ABS)