Installation
AUDIO / VISUAL: NETWORK GATEWAY ECU:
INSTALLATION
1. INSTALL NETWORK GATEWAY ECU
(a) Install the network gateway ECU with the bolt.
(b) Connect the connector.
2. INSTALL INSTRUMENT PANEL SUB-ASSEMBLY
(a) Install the instrument panel (Installation).
3. CONNECT CABLE TO NEGATIVE BATTERY TERMINAL
4. PERFORM INITIALIZATION
(a) Perform initialization (Repair Instruction - Initialization).
NOTE: Certain systems need to be initialized after disconnecting and reconnecting the cable from the negative (-) battery terminal.