Diesel Data: Automotive Repair

Reassembly








3MZ-FE COOLING: RADIATOR:

REASSEMBLY

1. INSTALL OIL COOLER ASSEMBLY





(a) Clean the O-ring contact surface of the lower tank and oil cooler.
(b) Install 2 new O-rings to the oil cooler (procedure "A").
(c) Install the oil cooler to the lower tank.
(d) Install the plate washer and nut (procedure "B").
Torque: 8.3 Nm (85 kgf-cm, 73 in-lbf)
(e) Install the pipe (procedure "C").
Torque: 14.7 Nm (150 kgf-cm, 11 ft-lbf)
(f) Install the screw (procedure "D").
2. INSTALL RADIATOR TANK LOWER





(a) After checking that there are no foreign objects in the lock plate groove, install a new O-ring without twisting it.

HINT: When cleaning the lock plate groove, lightly rub it with sand paper without scratching it.





(b) Install the tank without damaging the O-ring.
(c) Tap the lock plate with a soft-faced hammer so that there is no gap between the lock plate and the tank.
3. ASSEMBLE SST





(a) Install the punch assembly to the overhaul handle, inserting it in the hole in part A as shown in the illustration.
SST: 09230-01010
SST: 09231-14010
(b) While gripping the handle, adjust the stopper bolt so that dimension B shown in the illustration.
Dimension B:
8.4 mm (0.331 in.)
4. CAULK LOCK PLATE





(a) Lightly press SST against the lock plate in the order shown in the illustration. After repeating this a few times, fully caulk the lock plate by gripping the handle until stopped by the stopper plate.
SST: 09230-01010

- Do not tap the areas protruding around the pipes, brackets or tank ribs.
- The dotted circles shown in the illustration and parts of the oil cooler near the dotted circles (A/T) cannot be tapped with the SST. Use pliers or similar objects and be careful not to damage the core plates.

(b) Check the lock plate height (H) after completing the caulking.
Plate height (H):
7.40 to 7.80 mm (0.2913 to 0.3071 in.)
If not within the specified height, adjust the stopper bolt of the handle again and caulk again.
5. INSTALL DRAIN PLUG
(a) Install a new gasket to the ECT switch No. 1.
(b) Install the ECT switch.
Torque: 19.6 Nm (200 kgf-cm, 14 ft-lbf)
(c) Install a new O-ring to the drain plug.
(d) Install the drain plug.