Installation
U151E AUTOMATIC TRANSAXLE: PARK / NEUTRAL POSITION SWITCH:
INSTALLATION
1. INSTALL PARK/NEUTRAL POSITION SWITCH ASSEMBLY
(a) Install the park/neutral position switch to the manual valve shaft.
(b) Temporarily install the 2 bolts.
(c) Place a new lock plate and tighten the nut.
Torque: 6.9 Nm (70 kgf-cm, 61 in-lbf)
(d) Temporarily install the control shaft lever.
(e) Turn the lever counterclockwise until it stops, then turn it clockwise 2 notches.
(f) Remove the control shaft lever.
(g) Align the groove with the neutral basic line.
(h) Hold the switch in position and tighten the 2 bolts.
Torque: 5.4 Nm (55 kgf-cm, 48 in-lbf)
(i) Using a screwdriver, stake the nut with the lock plate.
(j) Install the control shaft lever, washer and nut.
Torque: 13 Nm (130 kgf-cm, 9 ft-lbf)
(k) Connect the park/neutral position switch connector.
2. CONNECT FLOOR SHIFT CABLE TRANSMISSION CONTROL SHIFT
(a) Connect the control cable to the control shaft lever with the nut.
Torque: 15 Nm (153 kgf-cm, 11 ft-lbf)
(b) Connect the control cable with a new clip to the bracket.
3. INSTALL ENGINE UNDER COVER LH
4. INSTALL INTAKE AIR RESONATOR SUB-ASSEMBLY
5. INSTALL AIR CLEANER HOSE NO.1
6. INSTALL AIR CLEANER ASSEMBLY
HINT: (Installation).
7. INSTALL ENGINE COVER NO.1 SUB-ASSEMBLY
8. INSTALL BATTERY
9. ADJUST SHIFT LEVER POSITION
HINT: (Adjustments).
10. INSPECT SHIFT LEVER POSITION
HINT: (Testing and Inspection).
11. INSPECT PARK/NEUTRAL POSITION SWITCH ASSEMBLY
HINT: (Testing and Inspection).
12. PERFORM INITIALIZATION
HINT: (Repair Instruction - Initialization).