Installation
U151E AUTOMATIC TRANSAXLE: TRANSMISSION CONTROL CABLE ASSEMBLY:
INSTALLATION
1. INSTALL FLOOR SHIFT CABLE TRANSMISSION CONTROL SHIFT
(a) Put in the control cable to the body.
(b) Install the shift cable grommet retainer No.2 to the floor shift cable.
(c) Install the floor shift cable as shown in the illustration.
HINT:
- Install it with the uneven surface facing up.
- Securely engage the claws.
(d) Connect the control cable to the control cable clamp.
(e) Connect the control cable with a new clip to the bracket.
(f) Temporarily install the control cable to the control shaft lever with the nut.
2. INSTALL SHIFT CABLE GROMMET RETAINER NO.2
(a) Install the shift cable grommet retainer No.2 with the 2 bolts.
Torque: 5.0 Nm (51 kgf-cm, 44 in-lbf)
3. INSTALL CENTER AIRBAG SENSOR ASSEMBLY
HINT: (Installation).
4. INSTALL AIR CONDITIONING RADIATOR ASSEMBLY
HINT: (Installation).
5. ADJUST SHIFT LEVER POSITION
HINT: (Adjustments).
6. INSPECT SHIFT LEVER POSITION
HINT: (Testing and Inspection).
7. INSTALL INTAKE AIR RESONATOR SUB-ASSEMBLY
8. INSTALL AIR CLEANER ASSEMBLY
HINT: (Installation).
9. INSTALL BATTERY NEGATIVE TERMINAL
10. PERFORM INITIALIZATION
HINT: (Repair Instruction - Initialization).