1. INSTALL NO. 2 ANTENNA CORD SUB-ASSEMBLY
(a) Install the No. 2 antenna cord sub-assembly with the hot glue as shown in the illustration.





2. INSTALL ROOF HEADLINING ASSEMBLY

HINT: Refer to the installation procedures of the roof headlining assembly Installation.

3. INSTALL INSTRUMENT PANEL SAFETY PAD SUB-ASSEMBLY (w/ Front Passenger Airbag) Installation
4. CENTER SPIRAL CABLE Installation
5. INSTALL STEERING WHEEL ASSEMBLY Installation
6. INSTALL STEERING PAD Installation
7. CONNECT CABLE TO NEGATIVE BATTERY TERMINAL
8. PERFORM SYSTEM INITIALIZE Installation
9. INSPECT STEERING PAD Installation
10. INSPECT SRS WARNING LIGHT Installation