Installation
METER: COMBINATION METER: INSTALLATION
INSTALLATION
1. INSTALL COMBINATION METER ASSEMBLY
2. INSTALL INSTRUMENT CLUSTER FINISH PANEL SUB-ASSEMBLY
3. INSTALL INSTRUMENT CLUSTER FINISH PANEL SUB-ASSEMBLY CENTER
4. INSTALL INSTRUMENT PANEL SUB-ASSEMBLY
5. INSTALL INSTRUMENT PANEL FINISH PLATE (w/o Smart Key System)
6. INSTALL INSTRUMENT CLUSTER FINISH PANEL GARNISH NO.2
7. INSTALL INSTRUMENT CLUSTER FINISH PANEL GARNISH NO.1
8. CONNECT CABLE TO NEGATIVE BATTERY TERMINAL
9. PERFORM INITIALIZATION
(a) Some systems need initialization when disconnecting the cable from the negative battery terminal Repair Instruction - Initialization.