Installation
U660E AUTOMATIC TRANSAXLE: PARK / NEUTRAL POSITION SWITCH: INSTALLATION
INSTALLATION
1. INSTALL PARK/NEUTRAL POSITION SWITCH ASSEMBLY
(a) Move the shift lever to the N position.
(b) Align the protrusions of the park/neutral position switch.
(c) Install the park/neutral position switch to the control shaft with the 2 bolts.
Torque: 5.4 Nm (55 kgf-cm, 48 in-lbf)
NOTE:
- Before installing the park/neutral position switch, remove any dirt or rust on the installation portion of the control shaft. Be sure to install the switch straight along the shaft while being careful not to deform the plate spring that supports the shaft. If the plate spring is deformed, the park/neutral position switch cannot be reinstalled correctly.
- After installing the park/neutral position switch, confirm that the 2 protrusions on the switch are aligned.
(d) Connect the connector to the park/neutral position switch.
2. INSTALL TRANSMISSION CONTROL CABLE ASSEMBLY
(a) Connect the transmission control cable assembly to the transmission control cable bracket with a new clip.
(b) Install the control shaft lever with transmission control cable assembly to the control shaft with the nut and washer.
Torque: 13 Nm (133 kgf-cm, 10 ft-lbf)
3. INSTALL NO. 1 AIR CLEANER INLET Installation
4. REMOVE AND INSTALL AIR CLEANER CASE Installation
5. INSTALL AIR CLEANER CAP WITH AIR CLEANER HOSE Installation
6. INSTALL NO. 2 AIR CLEANER INLET Installation
7. INSTALL COOL AIR INTAKE DUCT SEAL Installation
8. CONNECT CABLE TO NEGATIVE BATTERY TERMINAL
9. INSPECT PARK/NEUTRAL POSITION SWITCH ASSEMBLY OPERATION Initial Inspection and Diagnostic Overview
10. INSPECT SHIFT LEVER POSITION Adjustments
11. ADJUST SHIFT LEVER POSITION Adjustments