Installation
2AZ-FE EMISSION CONTROL: HEATED OXYGEN SENSOR: INSTALLATION
INSTALLATION
1. INSTALL HEATED OXYGEN SENSOR
(a) Temporarily tighten the heated oxygen sensor.
NOTICE: Do not damage the heated oxygen sensor.
(b) Using SST, fully tighten the heated oxygen sensor.
SST: 09224-00010
Torque: 44 Nm (449 kgf-cm, 32ft-lbf)
(Named image not found)
(c) Connect the heated oxygen sensor connector.