Diesel Data: Automotive Repair

Installation








U250E AUTOMATIC TRANSAXLE: PARK / NEUTRAL POSITION SWITCH: INSTALLATION

INSTALLATION

1. INSTALL PARK/NEUTRAL POSITION SWITCH ASSEMBLY





(a) Install the park/neutral position switch to the manual valve shaft.
(b) Temporarily install the 2 bolts.





(c) Place a new lock plate and tighten the nut.
Torque: 6.9 Nm (70 kgf-cm, 61in-lbf)
(d) Temporarily install the control shaft lever.





(e) Turn the lever counterclockwise until it stops, then turn it clockwise 2 notches.
(f) Remove the control shaft lever.





(g) Align the groove with the neutral basic line.
(h) Hold the switch in position and tighten the 2 bolts.
Torque: 5.4 Nm (55 kgf-cm, 48in-lbf)





(i) Using a screwdriver, stake the nut with the lock plate.





(j) Install the control shaft lever, washer and nut.
Torque: 13 Nm (130 kgf-cm, 9ft-lbf)





(k) Connect the park/neutral position switch connector.
2. CONNECT TRANSMISSION CONTROL CABLE ASSEMBLY





(a) Connect the transmission control cable to the bracket with a new clip.





(b) Connect the transmission control cable assembly to the control shaft lever with the nut.
Torque: 15 Nm (150 kgf-cm, 11ft-lbf)
3. INSTALL BATTERY Installation
4. CONNECT CABLE TO NEGATIVE BATTERY TERMINAL
Torque: 6.9 Nm (70 kgf-cm, 61in-lbf)
5. INSPECT SHIFT LEVER POSITION Adjustments
6. ADJUST SHIFT LEVER POSITION Adjustments
7. INSPECT PARK/NEUTRAL POSITION SWITCH ASSEMBLY
HINT: Testing and Inspection.