Weld Inspection Procedure
1. Locate two welds as indicated approximately 10 in. (254 mm) outboard of the center tunnel.
2. Remove 4x4 in. (101.6x 101.6 mm) section of asphalt sheeting around the welds.
3. Using a feeler gauge inspect for a gap between the floor pan and subframe mounting structure at both weld locations.
NOTE
If gap is present, weld must be rewelded.