Removal
2AZ-FXE ENGINE CONTROL SYSTEM: CAMSHAFT TIMING OIL CONTROL VALVE ASSEMBLY: REMOVAL
REMOVAL
1. REMOVE NO. 1 ENGINE COVER SUB-ASSEMBLY Removal
2. SEPARATE BRAKE MASTER CYLINDER RESERVOIR SUB-ASSEMBLY
(a) Remove the 2 bolts and separate the brake master cylinder reservoir sub-assembly.
3. REMOVE CAMSHAFT TIMING OIL CONTROL VALVE ASSEMBLY
(a) Disconnect the camshaft timing oil control valve assembly connector.
(b) Remove the bolt and camshaft timing oil control valve assembly.