Installation
2AZ-FXE EMISSION CONTROL: PCV VALVE: INSTALLATION
INSTALLATION
1. INSTALL VENTILATION VALVE SUB-ASSEMBLY
(a) Apply adhesive to 2 or 3 threads of the ventilation valve.
Adhesive:
Toyota Genuine Adhesive 1324, Three Bond 1324 or equivalent
(b) Using a 22 mm deep socket wrench, install the ventilation valve.
Torque: 19 Nm (194 kgf-cm, 14ft-lbf)
NOTICE: Do not start the engine within 1 hour after installation.
(c) Connect the ventilation hose.
2. INSPECT FOR EXHAUST GAS LEAK
3. INSTALL NO. 1 ENGINE COVER SUB-ASSEMBLY Installation
4. INSTALL BRAKE MASTER CYLINDER RESERVOIR SUB-ASSEMBLY Installation