Installation
2AZ-FXE STARTING: POWER SWITCH: INSTALLATION
INSTALLATION
1. INSTALL POWER SWITCH
(a) Attach the 2 claws to install the power switch.
2. INSTALL LOWER INSTRUMENT PANEL FINISH PANEL (for TMC Made) Installation
3. INSTALL LOWER INSTRUMENT PANEL FINISH PANEL (for TMMK Made) Installation