Diesel Data: Automotive Repair

Installation








2GR-FE EMISSION CONTROL: PURGE VALVE (for EVAP): INSTALLATION

INSTALLATION

1. INSTALL NO. 1 VACUUM SWITCHING VALVE





(a) Install the No. 1 vacuum switching valve with the bolt.
Torque: 5.0 Nm (51 kgf-cm, 44in-lbf)





(b) Connect the 2 vacuum hoses and No. 1 vacuum switching valve connector.
2. INSTALL V-BANK COVER SUB-ASSEMBLY Installation