Installation
2GR-FE EMISSION CONTROL: PURGE VALVE (for EVAP): INSTALLATION
INSTALLATION
1. INSTALL NO. 1 VACUUM SWITCHING VALVE
(a) Install the No. 1 vacuum switching valve with the bolt.
Torque: 5.0 Nm (51 kgf-cm, 44in-lbf)
(b) Connect the 2 vacuum hoses and No. 1 vacuum switching valve connector.
2. INSTALL V-BANK COVER SUB-ASSEMBLY Installation