Installation
2ZR-FE INTAKE / EXHAUST: INTAKE MANIFOLD: INSTALLATION
INSTALLATION
1. INSTALL INTAKE MANIFOLD
(a) Using a "TORX" socket E6, install the 2 stud bolts to the intake manifold.
Torque: 5.0 Nm (51 kgf-cm, 44 in-lbf)
(b) Install the bracket with the bolt.
Torque: 10 Nm (102 kgf-cm, 8 ft-lbf)
(c) Install a new gasket into the intake manifold.
(d) Install the intake manifold and intake manifold stay with the 4 bolts and 2 nuts.
Torque: 28 Nm (286 kgf-cm, 21 ft-lbf)
(e) Connect the 3 hoses.
(f) Connect the wire harness bracket with the bolt.
Torque: 10 Nm (102 kgf-cm, 8 ft-lbf)
2. INSTALL THROTTLE BODY ASSEMBLY Installation
3. INSTALL AIR CLEANER CAP SUB-ASSEMBLY Installation
4. INSTALL NO. 2 CYLINDER HEAD COVER Installation
5. ADD ENGINE COOLANT Service and Repair
6. INSPECT FOR COOLANT LEAK Testing and Inspection