Installation
U250E AUTOMATIC TRANSMISSION / TRANSAXLE: TRANSMISSION WIRE: INSTALLATION
INSTALLATION
1. INSTALL TRANSMISSION WIRE
(a) Coat a new O-ring of the transmission wire connector with ATF WS and install it to the transmission wire.
(b) Install the transmission wire with the bolt.
Torque: 5.4 Nm (55 kgf-cm, 48 in-lbf)
(c) Connect the transmission wire connector.
2. CONNECT TRANSMISSION WIRE
(a) Coat the O-ring of the ATF temperature sensor with ATF WS.
(b) Install the ATF temperature sensor with the lock plate and bolt.
Torque: 6.6 Nm (67 kgf-cm, 58 in-lbf)
(c) Connect the 7 shift solenoid valve connectors.
3. INSTALL AUTOMATIC TRANSAXLE OIL PAN SUB-ASSEMBLY
(a) Install the 2 magnets in the oil pan.
(b) Apply adhesive or equivalent to the 18 bolts.
Adhesive:
Toyota Genuine Adhesive 1344, Three Bond 1344 or equivalent
(c) Using a new gasket, install the oil pan to the transaxle case with the 18 bolts.
Torque: 7.8 Nm (80 kgf-cm, 69 in-lbf)
NOTE: Since the bolts should be seal bolts, apply adhesive to the bolts and tighten them within 10 minutes of application.
4. INSTALL TRANSMISSION OIL FILLER TUBE SUB-ASSEMBLY Installation
5. INSTALL BATTERY CARRIER Installation
6. INSTALL BATTERY Installation
7. CONNECT CABLE TO NEGATIVE BATTERY TERMINAL
NOTE: When disconnecting the cable, some systems need to be initialized after the cable is reconnected Repair Instruction - Initialization.
8. INSTALL ENGINE UNDER COVER LH
9. ADD AUTOMATIC TRANSAXLE FLUID
10. INSPECT TRANSAXLE FLUID LEVEL Procedures