Installation








U140F AUTOMATIC TRANSMISSION / TRANSAXLE: TRANSMISSION CONTROL CABLE: INSTALLATION

INSTALLATION

1. INSTALL TRANSMISSION CONTROL CABLE ASSEMBLY
NOTE: Before installing the transmission control cable assembly, check that the park/neutral position switch and the shift lever are in neutral.





(a) Put the transmission control cable into the cabin and connect the transmission control cable with the 2 nuts.
Torque: 5.0 Nm (51 kgf-cm, 44 in-lbf)





(b) Install the transmission control cable support with the nut.
Torque: 5.0 Nm (51 kgf-cm, 44 in-lbf)





(c) Connect the transmission control cable to the control cable bracket.





(d) Connect the transmission control cable to the bracket with a new clip.
(e) Connect the transmission control cable assembly to the control shaft lever with the nut.
Torque: 12 Nm (122 kgf-cm, 9 ft-lbf)
(f) Turn the nut of the transmission control cable 180° counterclockwise. While holding the nut in place, push in the stopper until the stopper clicks twice.





(g) Install the outer part of the transmission control cable to the shift lever retainer. Check that the spring is positioned at "A" and push in the stopper.




HINT: If the stopper cannot be pushed in, slightly turn the nut clockwise and then push in the stopper again.





(h) Push the 2 claws together at the top of the transmission control cable lock piece. While holding the 2 claws together, push the 2 lugs on the bottom of the lock piece toward each other and upward to pull out the lock piece.





(i) Install the cable end to the shift lever assembly.

NOTICE:
- Check that the lock piece is pulled up.
- Install the cable end all the way to the base of the pin.





(j) Push the lock piece into the adjuster case.
NOTE: Securely push in the lock piece until it locks.

2. INSTALL BATTERY CARRIER Installation
3. INSTALL BATTERY Installation
4. INSTALL AIR CLEANER CASE Installation
5. INSTALL AIR CLEANER CAP SUB-ASSEMBLY Installation
6. INSTALL NO. 1 ENGINE COVER SUB-ASSEMBLY Installation
7. INSTALL LOWER CENTER INSTRUMENT PANEL FINISH PANEL Installation
8. INSTALL FRONT NO. 1 CONSOLE BOX INSERT Installation
9. INSTALL FRONT NO. 2 CONSOLE BOX INSERT Installation
10. INSTALL FRONT CONSOLE BOX ASSEMBLY Installation
11. INSTALL CONSOLE BOX CARPET
12. INSTALL NO. 2 SWITCH HOLE BASE Installation
13. INSTALL FRONT UPPER CONSOLE BOX Installation
14. INSTALL CENTER INSTRUMENT CLUSTER FINISH PANEL ASSEMBLY Installation
15. INSTALL SHIFT LEVER KNOB SUB-ASSEMBLY Installation
16. INSTALL CENTER INSTRUMENT CLUSTER FINISH PANEL SUB-ASSEMBLY Installation
17. CONNECT CABLE TO NEGATIVE BATTERY TERMINAL Installation
18. INSPECT SHIFT LEVER POSITION Adjustments
19. ADJUST SHIFT LEVER POSITION Adjustments