Installation
2ZR-FE EMISSION CONTROL: CANISTER: INSTALLATION
INSTALLATION
1. INSTALL CHARCOAL CANISTER ASSEMBLY
(a) Install the 3 bolts and charcoal canister assembly.
Torque: 19 Nm (194 kgf-cm, 14 ft-lbf)
(b) Connect the charcoal canister filter sub-assembly and 2 clamps to the charcoal canister assembly.
(c) Connect the purge line hose.
(d) Connect the wire harness clamp.
(e) Connect the vapor pressure sensor connector.
(f) Connect the fuel tank vent hose to the charcoal canister.