Installation
2ZR-FE EMISSION CONTROL: PCV VALVE: INSTALLATION
INSTALLATION
1. INSTALL VENTILATION VALVE SUB-ASSEMBLY
(a) Apply adhesive to 2 or 3 threads of the ventilation valve sub-assembly.
(b) Using a ball joint lock nut wrench (22 mm), install the ventilation valve sub-assembly.
without a ball joint lock nut wrench (22 mm) - Torque: 20 Nm (204 kgf-cm, 15 ft-lbf)
with a ball joint lock nut wrench (22 mm) - Torque: 10 Nm (102 kgf-cm, 7 ft-lbf)
2. INSTALL INTAKE MANIFOLD Installation